Budgeting for Contingent Owned Equipment Freight Costs (Form: MPU_013)

This course covers how to plan for freight costs associated with moving COE between the mission area and the Troop and Police Contributing Countries.

MILITARY AND POLICE FORUM

Abstract

Please note, this course and its corresponding guide are currently in draft pending clearance by the respective subject matter experts.

The course for MPU Contingent Owned Equipment (COE) Freight Cost (Form: MPU_013) is used to plan for freight costs associated with moving COE between the mission area and the Troop and Police Contributing Countries. The form allows you to input the freight cost per cubic meter and the volume in cubic meters of COE to be freighted between the mission area and the relevant troop and Police Contributing Countries and allocate the COE Freight Cost by location.